Trower Neighborhood Center Improvements Project CIP935

The general description of work includes leveling of the existing concrete perimeter footing and slab floor of the existing Trower Neighborhood Center building located at 100 Holly Lane building via polyurethane grout injection. The project will also include removal and replacement of an existing sanitary waste line within the building envelope, removal and replacement of the existing flooring, installation of a roof drain and connection to the existing roof drain system, repair of dryrot, and possible removal and replacement of existing site concrete, and such other items or details not mentioned above, which are required by the Project Plans or this Project Manual to be performed, placed, constructed, or installed. The first contract working day shall be April 13, 2020.

Status

Pending

Prebid Date2/27/20 9:00 am

Company & Contacts

City of Vacaville

Chris Gioia   (707) 449-5160

Location

100 Holly Lane, Vacaville

Engineers Estimate: $161,580

Bid Opening Date: March 12, 2020 at 2:00 PM
at Vacaville City Hall, 650 Merchant St., Vacaville, CA 95688

Mandatory Pre-Bid Meeting: February, 27 at 2020 at 9:00 AM.

Bid Package Price: $50.00 + shipping

IMPORTANT SPECIAL NOTICE
****************************************

1. Contractor’s attention is directed to Section 2-1-05 “Withdrawal of Bids” of these Special Provisions for Updated bid withdrawal requirements.
2. Contractor’s attention is directed to Section 2-1.10 “Required Listing of Proposed Subcontractor’s” of these Special Provisions for requirements to list subcontractor’s public works contractor registration number pursuant to Section 1725.5 of the Labor Code