2023 AC Repair Project
The general description of work includes: Cold planing existing asphalt concrete and plug paving areas of various sizes as tabulated in the plans, and the replacement of the existing striping.
    
    
    
    
    
    
    
            
                                                Bid Documents
                 (click to expand/collapse)
 (click to expand/collapse)
            
             (click to expand/collapse)
 (click to expand/collapse)
            | Name | Size | ||
| Draft_proposal_CIP1027 | 264.8 KB | ||
| Sampe_contract_CIP1027 | 214.5 KB | 
                                                Specifications
                 (click to expand/collapse)
 (click to expand/collapse)
            
             (click to expand/collapse)
 (click to expand/collapse)
            | Name | Size | ||
| CIP 1027_2023 AC Repair_Specs for Bid | 1.2 MB | 

