2023 AC Repair Project
The general description of work includes: Cold planing existing asphalt concrete and plug paving areas of various sizes as tabulated in the plans, and the replacement of the existing striping.
Bid Documents
(click to expand/collapse)

Name | Size | ||
Draft_proposal_CIP1027 | 264.8 KB | ||
Sampe_contract_CIP1027 | 214.5 KB |
Specifications
(click to expand/collapse)

Name | Size | ||
CIP 1027_2023 AC Repair_Specs for Bid | 1.2 MB |